DescriptionThe purpose of this research is to assess the ability of reclamation plantations of walnut and black nut to accumulate heavy metals in phytomass – leaves, shoots, fruits. The studies were conducted in the Rostov region, as well as in the Krasnodar and the Stavropol regions
-
06.00.00 Agricultural sciences
DescriptionThe purpose of the research is to assess the ability of reclamation plantations of walnut and black nut on the accumulation of heavy metals in their phytomass – leaves, shoots, and fruit. The studies were conducted in the Rostov region, the Krasnodar and the Stavropol regions. In the samples of vegetative aboveground and soil (under the canopy nuts) we have defined qualitative content of total forms of heavy metals of Cu, Ni, Co, Zn, Mn, Pb, Cd, Cr. This ability is the accumulation of heavy metals in leaves, shoots and fruit that fall from the atmosphere. Later, the bulk forms of these metals with the annual litter come to litter, and then – into the soil
-
Description
The article presents data on the survey of beamed ponds and dams on the beams of Berestova, Shcherbakova and Gruzskoe on the territory of the Rostov region and establishes their poor condition. To use the ponds as a water source for irrigation of surrounding agricultural land, it is necessary to conduct repairing work on water ponds. In the article, to improve the efficiency of irrigation on local runoff, delayed in beams of low head dams we have proposed an improved design of fastenings (coatings) of upland slopes of groundwater retaining structures, including the ranks of absorbing wave elements. We have recommended symmetric and asymmetric placement of the semi-oval and tapered parts. We have also proposed a simple solution of wave absorbing elements as parts of a triangular shape (isosceles and equilateral), mutual accommodation of which also forms a water conveyance channels for mutual collision of threads
-
Description
The article discusses the new technical solutions and the technology of undercrown micro-irrigation of horticultural crops, taking into account the formation of their root system and circuit humidification
-
Description
The calculation of pumping equipment and piping network parameters is presented. The method of cutting impeller pump diameter for optimal performance of pump unit with piping system on efficiency value is shown. The case of operating the distribution network and pumping station with three pump units D1250-25 is considered. Procedure of construction of loss-of-head curves in pipes, determination of the actual operating parameters of a single pump unit, selection of pump impeller diameter for essentials is indicated. Four points for graphing such curves are presented. According to the first point the whole network is divided into sections with suction, pressure main pipelines and pipelines with changing water flow compared with the previous ones. The second point involves definition of the electrical resistivity of each site. The resistance of network analyzer is determined in the third point, the loss-of -head of the whole network is determined in the fourth point. The article presents the scheme of pumping station with three pump units connected in parallel and a distribution network (Figure1), loss-of-head curves in pipes regardless the number of working pumps (Figure 2), the order of constructing three loss-of-head curves with operating one, two and three pumps with normal and cut pump impeller diameter (Figure 3 ), the order of determination of the actual parameters of pump work characteristics according to combined characteristics of normal and cut pump impeller diameter ( Figure 4) In conclusion, it is stated that the question of proper definition of actual parameters of pumps and the support of these parameters in optimal mode remains open due to the lack of proper methods of constructing loss-of-head curves pipeline. Every similar calculation is preliminary and should be carried out in field conditions
-
Description
The article presents the design study for construction of a drainage system on the territory of gardening association «Zarya» in the region of Gukovo in Krasnosulinsky district of Rostov region. Construction of a drainage system is a prerequisite for reducing the groundwater level caused by the infiltration of the drainage complex mine called Burgustinskaya. The results of the calculations determined the value of the total infiltration groundwater feeding; inflow rate to each of the 6 drains per unit length, water flow ability of a horizontal pipe drainage, as well as a diameter of drainage pipes
-
CALCULATION OF THE UNSTEADY WATER LINE IN THE KRASNODAR SUBURBAN CHANNEL FOR WATER MEASUREMENT
DescriptionLow level of water accounting and poor control in water distribution in the irrigation system are the main negative factors of industrial influence on irrigated natural complexes. Complex ecosystem way to control water resources involves qualitative improvement and optimization of all parts and elements of irrigation system, from the headwater pool, main channels to local water distribution channels. In this regard, when engineering, constructing, using some new and reconstructed old irrigated systems, the most important problems are the optimization of water use from natural water resources, development and use of highly efficient water-saving and energy-saving technologies of water distribution and water use in the irrigation system. The problem of economical and efficient consumption of water resources on the studied water complex cannot be solved successfully without any related consideration of water accounting and water consumption questions based on system principles. System principles are supposed to collect, analyze and use the information, with the help of complex technical means, which are used for water measurement in conditions of water charges, and for the purpose to control the technological processes of water supply and water drainage, when the needs of water users are satisfied and the environment get less damage. In the work, we study the mathematical calculation of the unsteady water line in the Krasnodar suburban channel for water measurement. The imitated research of hydraulic processes were carried out on the mathematical model of water measurement, based on the characteristic methods, with the use of analytical solution of ordinary differential equations of the initial characteristics. The use of the considered method of water measurement in irrigation channels with the use of analytical solution of ordinary differential equations of initial characteristics will allow to optimize the processes of water measurement and to minimize idle and non-technological discharges of water from the system
-
Description
The article focuses on current issue of improving the reliability of water intake buildings in the Far North. We have given special operating conditions of these structures, particularly ice drift, shore ice piles, windrowing ice fields and erosion of the bottom of the moving ice field with keel protrusion. We have described physiographic, structural and morphological conditions of the construction site, generalized information on the parameters ice drift during an ice moving in the waters of the Gulf of Ob in Salmanovskaye deposit area. For these conditions, we have accepted to make water intake structure with recessed filtering part and given idea about their ice protection and proposed an effective design of protective constructions for all possible effects of ice hummocks. We have also given a description of bases of technology of construction works the rationale for the design parameters of facilities. In view of the possible load, two rows of closed pile foundations are provided for the protection of water receivers consisting of bored piles and channel filtering grillage. In the first row, near to the water receivers we have provided metallic, lattice constructions from metal profile pipes laid on the top of water receivers on the grillage. The second row of protective structures around water receivers was designed as a halfly indepth monolithic reinforced concrete grillage of rectangular cross-section form with an ice pick from a metal corner rental rendered monolithic on the outside perimeter of the grillage. Concrete grating are designed also to protect the gravity pipelines along the borders. Rectangular grillages interconnected with cross bar bonds witch are also made of reinforced concrete. The proposed technical solutions provide reliable protection against possible water intake facilities including dynamic effects from windrowing ice fields in the Far North. Options include new constructions of underground horizontal and channel filter water intake structures that could be effectively used in such conditions
-
Description
The article contains a scientifically based approach to assessing and improving the reliability of DMU "Frigate" in the conditions of the Rostov region. The studied parameters for the elements with the lowest resource were: mean time between failure, mean time to repair, probability of failure, the parameter flow of failures, failure rate, actual and allowable factors of readiness. The analysis of the main faults of DMU "Frigate", identified nodes and elements, characterized by the low reliability, for which the dependences of probabilities of failure-free operation, as well as the dependence and developed the procedure for calculating the optimal duration of recovery of failed elements, to ensure acceptable availability. Statistics on major faults refuse items were collected over the three irrigation seasons from 2013 to 2015, were investigated failures due to wear of the elements for 17 irrigation machines. As a result of the research we developed mathematical apparatus of calculation and the comparative assessment of the readiness of the parks sprinklers of various farms to perform their processing functions at the same and different number of machines. We obtained the dependence for determining the allowable duration of the recovery elements that will allow you to determine the main directions of improving the reliability of DMU "Frigate" during the operational phase
-
ESTIMATION AND SELECTION OF THE MOST OPTIMAL VARIANT DRAINING PONDS
DescriptionThis article gives estimation of drying (liquidation) ponds with subsequent selection of the most optimal variant. For example, ponds № 1, 2 have the calculations for the four drainage options: bottom outlet, using a mobile diesel pumping stations, through the siphon outlet, as well as the combined option of draining (via a bottom outlet and mobile pumping stations). The results of the calculation for each of the cases were examined; the article summarizes the estimated parameters, which allow to visualize and choose the most optimal variant of drying, depending on the time of evacuation