
name
Ryabukhin Lev Konstantinovich
Scholastic degree
—
Academic rank
—
Honorary rank
—
Organization, job position
• Kuban State Agrarian University
Research interests
строительные конструкции, основания зданий и сооружений
Web site url
—
Current rating (overall rating of articles)
0
TOP5 co-authors
Articles count: 1
Сформировать список работ, опубликованных в Научном журнале КубГАУ
-
Description
This article describes the practice of conducting a geotechnical monitoring of the road tunnel № № 8, 8а «Doubler Kurortnogo Prospekta» in Sochi in difficult geotechnical conditions. Geotechnical monitoring method was developed on the results of mathematical modeling performed based on engineering studies and design solutions. The particular importance is paid to areas of shallow road tunnels, because in these areas there are the highest strain that could lead to malfunction of the lithological technical system "accommodating array - fixing tunnel" and the further destruction of the road tunnel walling. Geotechnical monitoring at the stage of engineering survey allows us to assess comprehensively the condition of the geological environment in a pristine condition, as well as detailed consideration to the effect on her of construction of mining operations. Implementation of geotechnical monitoring at the stages the engineering survey and construction will identify weaknesses malfunction of the lithological technical system "accommodating array - fixing tunnel" and ensure the security of the operation of such a technically complex and demanding facilities such as road tunnels