Поиск статей
-
PROBLEMS OF AREA PROTECTION FROM FLOODS AND FLOODINGS
Description
The whole complex of problems reflecting interrela-tionship between nature and human society is ana-lyzed. It is pointed out that the problems of area pro-tection, prevention or minimization damage from floods and floodings that affect human interests practically all over the world should be solved on the basis of complex application of all available engineering and non - engineering means
-
PROTECTION OF THE KUBAN RIVER AGAINST FLOODS BY MEANS OF WORKED-BU-WATER FLEXIBLE DAMS
Description
The article deals with constructions of fast-erected dams from high-strength polymeric materials as well as with their production engineering and erection at a point of the dam failures and washouts of riverbeds. And the flowchart of work production on elimination of consequences by dam failures, their geometrical parameters and estimated cost also. Parameters and criteria of flexible dam’s stability for shift and over-turning are presented
-
FLOOD - CONTROL SYSTEM AT AGRI-CULTURE'S SERVICE
Description
Role of flood - control system on Low Kuban River for protection of agricultural lands from dangerous impact of waters is analyzed in the paper.
-
Description
In article the flooding and rehumidifying tendency of the lands in Krasnodar region is estimated. For re-vealing of the reasons conducting to growth of the sizes of the rehumidified lands and definition of ways of land improvements of the rehumidified lands it is necessary to establish the factors of the influence causing distribution of the rehumidified lands
-
FORECASTING ESTIMATIONS OF ECO-LOGICAL CONSEQUENCES OF FRESHET ACTIVITY IN POOL OF THE RIVER KUBAN
Description
In the article estimations of catastrophic flooding for the last years are given, and also the actions planned for prospect on unwater are given protec-tion. Damages from flooding are estimated in eco-nomic and ecological terms
-
APPLICATION OF UNUSUAL DESIGN IN HIGH-RISE CONSTRUCTION BY USING MODERN BORING TECHNOLOGIES
Description
The paper describes methods to increase the economic and technical aspects of high-rise projects located on sites with week subsoil conditions and low-sized site plan. Proposed and applied construction elements let us achieve high efficiency for realized project situated on a site with limited square. Advantages of CFA technology have been shown